Dubai Municipality

Dubai Waste To Energy Plant

P100 Project for EGA

Emirates Global Aluminum

Emirates Global Aluminum

HRSG Replacement, Electrical, Instrumentation & Control Package

SAMSUNG CT

ADNOC HVDC Project

DEWA

Engineering, Procurement & construction of CLO2 System at L-Station, JAPS

DEWA

EPC For CLO2 SYSTEM DESALINATION & RO PLANT in G STATION

DEWA

Storage Tank for M Station

ADWEA

Dosing system of Hydrated lime in Doosan Remin plant & HZ REMIN Plant in Umm Al Nar, Abu Dhabi

Abu Dhabi International Airport

Water Meter Panels for Water Pumping Station at Abu Dhabi Airport

Al Ain International Airport

Aircraft Disposal Plant at Al Ain International Airport

Transco

Control system for Taweela A1 Pumping station

Transco

Integration of Al Maha Site to WCC

Transco

Vibration & Temperature measurement systems in Shobasi and Remah Pumping Stations

Transco

Water Quality Equipment in Qidfa and Al Dhaid

Transco

Flowmeters in Madinat Zayed & Liwa Pumping stations

Abu Dhabi International Airport

Upgradation of Abu Dhabi Airport Pumping Station

DEWA

Cathodic Protection System in DEWA K Station

DEWA

Wet Compression upgrade in Gas Turbines DEWA k-station Jebel Ali.

Emirates Global Aluminum

Crane Conductor Rails Installation in Cast House 2.

Emirates Global Aluminum

Emergency 400V AC power supply for Phase-2 GIS Substation 4411 in EGA

Sharjah Airport

PNP 438 - Replacement of Lights & Ceiling in Concourse Area Phase 1 & Phase 2

Sharjah Airport

Copper Pipe Replacement in MTB

Emirates Global Aluminum

Cable Tunnel Ventilation System

Abu Dhabi International Airport

UPVC Drainage Pipe in Chiller Room at Power Complex

RTA

Automated Bus Washing System for Dubai RTA

Emirates Global Aluminum

Replacement of UPS in PL5A and PL5B

Emirates Global Aluminum

Interior design & Fit out execution for New control room above 420A

Emirates Global Aluminum

J17/048 - FTA Cranes Catenary & Trolley Upgradation at Baking Kilns