86_full

Major Projects with TRANSCO

  • Integration of Al Maha Site to WCC
  • Taweelah A1 Filed Instruments & Panel Rectification.
  • Replacement of Water Quality Equipment in Qidfa
  • Replacement of the control system in Taweela A1 pumping station
  • Supply, install, integration and commissioning for New vibration & Temperature measurement systems in Shobasi and Remah Pumping Stations.