Project Category: Dubai EGA Project

crane 2

Crane Conductor Rails Installation in Cast House 2.

The work involves expanding ABB and GE LV Switchgear in substations 4410 and 4411, adding 2000A ACB interconnector panels with LSIG protection. We’ll also modify interlocks to prevent accidental transformer parallel operation.

Read More
Emergency 400V AC power supply for Phase-2 GIS Substation 4411 in EGA

Emergency 400V AC POWER SUPPLY FOR PHASE-2 GIS SUBSATION 4411-EMAL.

The work involves expanding ABB and GE LV Switchgear in substations 4410 and 4411, adding 2000A ACB interconnector panels with LSIG protection. We’ll also modify interlocks to prevent accidental transformer parallel operation.

Read More
clo2

CLO2 SYSTEM L-STATION, JAPS

Electrical work includes transformer installation, cable tray setup, power cable laying, and more. Instrumentation work involves PLC panel installation, cable termination, and testing.

Read More
image (9)

Energy Optimization and Capacity Creep Project E & I Package

Electrical work includes transformer installation, cable tray setup, power cable laying, and more. Instrumentation work involves PLC panel installation, cable termination, and testing.

Read More