The work involves expanding ABB and GE LV Switchgear in substations 4410 and 4411, adding 2000A ACB interconnector panels with LSIG protection. We’ll also modify interlocks to prevent accidental transformer parallel operation.
Emergency 400V AC POWER SUPPLY FOR PHASE-2 GIS SUBSATION 4411-EMAL.
The work involves expanding ABB and GE LV Switchgear in substations 4410 and 4411, adding 2000A ACB interconnector panels with LSIG protection. We’ll also modify interlocks to prevent accidental transformer parallel operation.
CLO2 SYSTEM L-STATION, JAPS
Electrical work includes transformer installation, cable tray setup, power cable laying, and more. Instrumentation work involves PLC panel installation, cable termination, and testing.
Energy Optimization and Capacity Creep Project E & I Package
Electrical work includes transformer installation, cable tray setup, power cable laying, and more. Instrumentation work involves PLC panel installation, cable termination, and testing.