Get In Touch
Contacts
Location
Al Waha Tower- HC Floor
Office No:09 & 10
AL Khan Corniche St - Sharjah
Dubai Engineering Co. LLC (DECO)

Project Details

Emergency 400V AC power supply for Phase-2 GIS Substation 4411 in EGA

Emergency 400V AC POWER SUPPLY FOR PHASE-2 GIS SUBSATION 4411-EMAL.

The work involves expanding ABB and GE LV Switchgear in substations 4410 and 4411, adding 2000A ACB interconnector panels with LSIG protection. We’ll also modify interlocks to prevent accidental transformer parallel operation.