Get In Touch
Contacts
Location
Al Waha Tower- HC Floor
Office No:09 & 10
AL Khan Corniche St - Sharjah
Dubai Engineering Co. LLC (DECO)

Project Details

(CIO2) dioxide for dewa with decoproject MEIDUM

DUBAI EGA PROJECT

Scope of work: Supply, install, test, and commission E, C&I systems at EGA’s Al Taweelah Smelter, including greenfield and brownfield areas. Also, decommission control panels in Potline. This includes electrical equipment, panels, lighting, power cables, and more. Communication and instrumentation tasks encompass ICP, PLC, and Network Switch Panels, as well as cables and panels. We splice control and fiber optic cables, install various instruments, conduct loop testing, calibration, and commissioning under EGA’s supervision.