Get In Touch
Contacts
Location
Al Waha Tower- HC Floor
Office No:09 & 10
AL Khan Corniche St - Sharjah
Dubai Engineering Co. LLC (DECO)

Project Details

warsan-gallery-01
warsan-gallery-03

DUBAI WASTE TO ENERGY

DECO is in charge of supplying, installing, and testing the E, C & I Systems for a Waste To Energy Power Plant in Dubai’s Warsan 02. This includes 5 Waste Thermal Treatment Units, processing 5000 tonnes of waste daily, and a 200 MW Steam Turbine. DECO’s responsibilities extend to electrical and instrumentation work in plant areas like process areas, substations, control rooms, boilers, FGT, and the Turbine area.

 

  • Solidifies Dubai’s position as a global leader in sustainable infrastructure
    Demonstrates Dubai’s commitment to sustainability and addressing waste management challenges while utilizing renewable energy sources
    Cost of the project is 4 billion UAE dirhams ($1.09 billion).
    The facility can generate 220 MWh of renewable energy.
    It can process two million tonnes of waste annually without any adverse environmental impact.